Every apocalypse needs a plan.

From Giles’s research to Willow’s testing spell: a Buffy-inspired SQL Server migration learning guide. Every control below runs locally, using illustrative examples rather than a live environment.

01 / Assessment

Research at the Library

Work through these four checks before comparing workloads or rehearsing a cutover.

0 of 4 assessment steps complete

The Tome of Prophecies

Four illustrative assessment topics from the original teaching guide. These are example review prompts, not findings from an actual database scan. No DMA report or private system data is loaded.

Prophecy of Incompatibility

Review stored procedures and compatibility settings against the intended target version. The original fixture concerns compatibility; it does not establish that a real procedure is incompatible.

Curse of Breaking Change

The original fixture names RAISERROR as a review topic. Compare actual application code with the target-version documentation and test its error-handling behavior. This example does not establish a breaking change.

Glamour of Behavior Change

The original fixture names COUNT with an OVER clause. Reconcile query results during workload testing. No changed result or defect is asserted by this teaching example.

Whispers of Deprecation

The original fixture names sp_dboption as a legacy-feature review topic. Inventory any actual usage and verify its status for the intended target version before planning a replacement.

02 / Workload comparison

Illustrative data

Willow’s Testing Spell

Willow’s testing spell compares the original illustrative source and target workload. Reveal the results to inspect the category counts; no workload is captured or replayed.

03 / Dependencies

The Evacuation Convoy

Illustrative dependency map: the web and SQL, API database and data database roles are interconnected Web + SQL API database Data database
The original three-role topology, with generic labels. It is an illustrative teaching map, not an infrastructure inventory.

All three roles are connected. Review each application path rather than treating a database as an isolated move.

  • Web + SQL ↔ API database
  • Web + SQL ↔ Data database
  • API database ↔ Data database

04 / Security

Fortifying Cleveland

Encrypts database files at rest. Validate certificate and key backup procedures before migration.

05 / Cutover ritual

Averting the Apocalypse

  1. Apply final log backups
  2. Migrate application configuration
  3. Deploy application code
  4. Validate data and application behavior
  5. Switch application traffic
  6. Confirm service health
  7. Retire the source after the agreed retention period

Ready for a local walkthrough.

Ask Giles: what should I check?

This is a scripted guide, not an AI service. Start with assessment and dependencies, compare representative workloads, rehearse rollback, then validate the whole application after cutover.

Reference notes & original examples

The original Buffy-themed guide is organized into five phases below. The examples are historical teaching material, not an assessment of a real migration. All demonstrations on this page run locally.

A Slayer’s guide, phase by phase.

Phase One: Research at the Library

Use the assessment checklist to plan the review, then expand each of the four illustrative finding topics in the Tome of Prophecies. The original guide refers to Data Migration Assistant (DMA); no scan is performed here.

Phase Two: Willow’s Testing Spell

Run the example workload comparison to reveal the original source/target counts and charts. Its values are illustrative, not measured performance results.

Phase Three: The Evacuation Convoy

Explore the three-role dependency map. Select a role to highlight its connections; the accompanying list exposes every connection as text.

Phase Four: Fortifying the New Home

Choose a security topic to read about encryption at rest, protected columns, HTTPS policy or auditing. These explanations are review prompts, not a deployment checklist.

Phase Five: Averting the Apocalypse

Rehearse the seven cutover steps, inspect the progress status, then reset the walkthrough. No systems, application traffic or DNS records are changed.